Riverside Medical Suite
Full fit-out of a 6,400 sq ft clinic — eleven exam rooms, lead-lined imaging, occupied building.



LICENSED GENERAL CONTRACTOR Greater Los Angeles & Southern California
Thirteen years of kitchens, additions, storefronts and tenant spaces across Los Angeles. One contract, one superintendent, one number to call — and a written bid before anyone picks up a tool.
Free walkthrough. No charge, and no sales pitch.
A-101 WHO WE BUILD FOR
The trades are the same. The paperwork, the hours, and the way we communicate are not. Pick the side that sounds like you — it'll set up your bid request.
RESIDENTIAL
We work in occupied houses. Floors get protected, the site gets swept every day we're there, and you get one number to text when something comes up.
COMMERCIAL
Bonded, COI on file before mobilization, and night or weekend crews when the space has to keep trading. We read your architect's set and flag conflicts early.
A-102 SCHEDULE OF WORK
We self-perform carpentry and finishes and hold the licensed subs directly, so you're not chasing five companies. Durations below are typical for a single-space job.
Dust containment, floor and surface protection, selective demo, debris haul-off, and a shared dumpster plan.
Load-bearing changes, beams and headers, engineered layout, and stamped drawings when the jurisdiction wants them.
Licensed trades held under our contract. We pull the permits and meet the inspector so you don't have to be there.
Level 4 or Level 5 finish, millwork and trim, tile, flooring, and a paint spec you sign off on before we spray.
Shop-built or supplier-sourced, field-templated for stone, and installed by our own carpenters.
Roofing, siding, windows and doors, decks, flashing details and waterproofing that actually gets inspected.
Walkthrough with you, warranty binder, as-builts, final clean, and lien releases from every sub before the last draw.
A-103 HOW A JOB RUNS
Most of what goes wrong on a job is a surprise nobody priced. This is the sequence we run on a $4,000 repair and on a $900,000 build-out alike.
01
We come look at it, free, and we'll tell you straight if it's not a job we should take.
02
A written bid with the allowances named and the exclusions named. No lump-sum mystery number.
03
We pull the permits and hand you a dated schedule with a start and a finish before anyone mobilizes.
04
The same lead on site every day, regular photo updates, and a written change order before any extra work starts.
05
You make the punch list, we clear it, then we invoice the final draw. Not before.
A-104 SELECTED PROJECTS
Every project below was closed out with a signed punch list. Ask for references on any of them.
Full fit-out of a 6,400 sq ft clinic — eleven exam rooms, lead-lined imaging, occupied building.
1920s four-square taken back to studs. New MEP, structural beam, kitchen and three baths.
Rolling build-out across four leases in one quarter. Night crews, stores never closed.
620 sq ft rear addition and second-storey master. Family stayed in the house throughout.
Structural mezzanine, new office pod, and code-required egress stair in a live distribution center.
Wall removal with a flush structural beam, custom cabinetry, and a hard deadline we hit.
REFERENCES
We had eleven stores to reset in one quarter and three GCs told us it couldn't be done without closing. Jad ran nights, hit every date, and I never once had to call them twice.
The bid had every line in it, including the stuff we didn't want to hear. Final invoice matched the bid within four hundred dollars on a kitchen and two baths.
They read the set properly and flagged two conflicts before we broke ground. That alone saved my client a change order bigger than their fee.
WHERE WE WORK
Crews are out in these towns most weeks. If you're a little outside the list, ask anyway — for the right job we travel.
A-105 QUESTIONS WE GET ASKED
Yes. A half-day of trim carpentry and a six-figure build-out go through the same process, just compressed. Small jobs are how most of our long-term clients started, and we'd rather do yours well than turn it away.
We won't guess at it over the phone, because a number pulled out of the air helps nobody. After the walkthrough you get a line-item bid with allowances and exclusions written out, so you can see exactly what's driving the price and where you have room to move.
It depends on the scope and on how busy your local permit office is. What we will do is give you a real date rather than "soon" — and if that date is ever at risk, you hear it from us first, not the other way round.
We do, on every job that needs one, and we meet the inspector. If a contractor asks you to pull the permit under your own name, that's them moving the liability onto you.
Just ask. We carry $2M general liability plus workers' comp, and we're bonded on commercial contracts. Property managers can have us added as an additional insured before mobilization — just ask when you request the bid.
A deposit to schedule, then draws tied to completed milestones — never to dates on a calendar. The final draw isn't invoiced until you've signed off on the punch list. We don't ask for large sums up front.
You get a written change order with the cost and the schedule impact, and nothing starts until you approve it. Old houses and old buildings hide things — the goal isn't zero surprises, it's zero surprise invoices.
Yes, and for retail, restaurant and clinical spaces it's often the cheaper option once you count lost trading days. Say so in your bid request and we'll price both ways.
A-106 REQUEST A BID
Three short steps. We read every one and come back to you with either a walkthrough time or an honest "not our scope."
We'll be in touch to book the walkthrough. If it's urgent, call us and we'll move it up.
Call (555) 019-2847